Summary
of the Notification of the Ministry of Interior
Re: Safety of Work: the Use of Scaffolding
Intention of the Law To ensure compliance to safety
standards in the use of scaffolding, in construction
work, construction procedures and the use of safety
equipment by construction workers.
Framework and Enforcement of the
Law
To have effect on works of
construction.
Not to take
effect on
1.
Construction of basically
wooden material, of which the structure
is no more than 7 meters from the ground.
2.
Repair or decoration jobs employing no
more than 2 workers at a time.
3.
The installation of plumbing pipes, electricity
lines or other equipments employing no more
than 2 workers at one time.
Main Points of the Law This notification issued by the Interior Ministry
specifies the design, construction, use, standard
of scaffolding as well as the
safety protection and standard of safety equipment
as follows.
Scaffolding is to be used in work done more than 2 meters above the
ground.
In cases where the scaffolding used does not comply with standard
specifications, it is to be designed and its details be specified by an
engineer.
In cases where there exists the use of transport elevators, the elevator
shaft is not to be affixed to the scaffolding and protective measures must
be made to ensure that the pressure from the elevator movement does not
disturb the scaffolding.
The scaffolding floor must be of no less than 35 centimeters in width.
There are to be safety rails of 0.40 to 1.10 meters from the floor on all
sides of the scaffolding.
There are to be ladders for access to the scaffolding.
There are to be canvas sheets or other material covering the scaffolding
on all sides.
The walkway under the scaffolding is to be protected.
In cases where work is carried out simultaneously on many levels, safety
protective equipment is to be provided for workers on the lower levels.
Work on the scaffolding is prohibited when the floors are slippery or when
there is thunderstorm.
In cases where the scaffolding is near unprotected electric cables or
other electric equipment, the exposed cable is to be covered up as
appropriate.
Protective safety gear is to be provided for workers as appropriate to
work conditions throughout the entire work period.
HTTP/1.1 404 Object Not Found
Server: Microsoft-IIS/5.0
Date: Tue, 06 Jan 2009 12:07:20 GMT
X-Powered-By: ASP.NET
Connection: close
Content-Type: text/html
404 Object Not Found
HTTP/1.1 404 Object Not Found
Server: Microsoft-IIS/5.0
Date: Tue, 06 Jan 2009 12:07:20 GMT
X-Powered-By: ASP.NET
Connection: close
Content-Type: text/html